[VIDEO] This is how the FGS Langeoog is pulled upon dry land

Published on

May 24, 2018

During the process of pulling the FGS Langeoog upon dry land we saw the possibility to make a short video. In this footage you can see a overview of SSN and how a ship is hoisted and pulled on its ramp and out of the water. With the help of the Missing Link and winches its possible to do this centimeter by centimeter. You can watch the video below:

 

You can find more information about the FGS Langeoog in our previous post. More information about the crane barge the Missing Link is found here.

Facebook | Twitter | LinkedIn | Instagram |

<< Next || Previous >>

All news posts
SSN aims for continuous improvement in safety, health and the environment and has therefore also been certified for ISO 9001 and ISO 14001.

Ons TEAM

Johan Poot

CEO

Lorem ipsum dolor sit amet, consectetur adipiscing elit,
suspendisse varius enim

David Muller

Lead Engineer

Lorem ipsum dolor sit amet, consectetur adipiscing elit,
suspendisse varius enim

Luk Turner

Architect

Lorem ipsum dolor sit amet, consectetur adipiscing elit,
suspendisse varius enim